Exhibit Planning Timeline: A Complete Guide

By Peter Symonds

Planning a trade show exhibit whilst juggling all your other responsibilities feels a bit like trying to organise a wedding whilst running a business. There are dozens of moving parts, multiple vendors to coordinate, deadlines that seem arbitrary until you miss one and face massive penalty fees, and a sneaking suspicion you've forgotten something crucial.

The exhibitors who nail trade shows aren't necessarily more talented or better funded - they just plan further ahead and follow a structured timeline. They know which tasks need doing six months out versus six weeks out, they hit early bird deadlines that save thousands, and they avoid the last-minute panic that leads to expensive mistakes.

Let's break down a comprehensive exhibit planning timeline from six months before show to post-show follow-up. Not every show requires the full six-month runway, but understanding the complete timeline helps you scale it appropriately for your specific situation.

6 Months Before: Strategic Planning

This is when you make the big decisions that shape everything else. Start by defining why you're exhibiting. What are your specific, measurable goals? "Get leads" is too vague. "Generate 150 qualified leads" or "schedule 20 product demonstrations" gives you concrete targets to plan around. Understanding setting SMART goals for trade shows ensures your objectives are specific enough to guide planning decisions.

Research shows thoroughly. Who's the target audience? What's the expected attendance? Who else is exhibiting - both competitors and complementary businesses? What's the show's reputation and track record? This information determines whether the show is worth your investment and how you should approach it.

Budget everything now, not later. Include booth space rental, display design and production, shipping and drayage, show services (electric, internet, furniture), staffing costs (travel, accommodation, meals), promotional materials, and giveaways. Add 20% buffer for unexpected expenses because there are always unexpected expenses.

Select and reserve your booth space. Early selection gives you better location options. Study the floor plan carefully - proximity to entrances, food courts, main aisles, and competitors all affect foot traffic patterns.

5 Months Before: Design and Production

Finalise your booth design concept. This includes the physical display structure, graphics, messaging, interactive elements, product displays, and technology integration. If you're working with a booth builder, this is when you hammer out specifications and get quotes.

Order custom booth elements now if you're building something new. Custom fabrication takes time, and you want it completed well before the show, not arriving the day before with no time to fix issues.

Design your graphics and messaging. This isn't just about making it look pretty - the graphics need to communicate clearly from 10 metres away, align with your show goals, and work with your booth configuration.

Book accommodation immediately. Hotels near popular shows fill up fast, and rates increase as inventory decreases. Your booth staff needs somewhere to sleep that doesn't require an hour commute each morning.

4 Months Before: Logistics and Promotion

Register with show management if you haven't already. Complete all exhibitor paperwork, which typically includes company information, insurance certificates, and emergency contacts.

Review the exhibitor kit thoroughly. This massive document contains rules, regulations, deadlines, order forms, and crucial information. Missing a deadline because you didn't read the kit is expensive and embarrassing.

Start promoting your attendance. Update your website, send emails to customers and prospects, post on social media, and include show details in your email signatures. The goal is driving people to visit your booth rather than hoping for random foot traffic.

Book your labour if required. Some venues mandate union labour for setup and breakdown. Scheduling this early ensures availability and sometimes gets better rates.

3 Months Before: Finalising Details

Order show services now to catch early bird discounts. This includes electrical connections, internet, furniture rental, lead retrieval systems, and cleaning services. Ordering three months out often saves 20-30% compared to standard rates.

Finalise your booth staffing plan. Who's working which shifts? What's everyone's specific role? How many staff do you need to cover all show days without burning anyone out? Remember that standing in a booth for 8 hours is exhausting - schedule breaks and rotate staff.

Plan your demonstrations or presentations if relevant. Schedule, script, and rehearse anything you're presenting at the booth. Stumbling through an unprepared demo wastes opportunities.

Arrange shipping logistics. Determine whether you're shipping directly to the venue or to an advance warehouse (advance shipping is almost always cheaper). Create a detailed packing list so nothing gets left behind.

2 Months Before: Materials and Training

Business Team Brainstorming Strategy on Whiteboard in Modern Office

Produce all printed materials - brochures, business cards, one-pagers, product sheets, case studies. These take longer than you expect once you factor in design iterations, printing, and delivery.

Order promotional items and giveaways if using them. Quality items with long lead times beat cheap rush orders. Make sure quantities align with expected attendance - running out on day one looks unprofessional.

Create and test any technology you're using. Tablets for demos, lead capture apps, presentation equipment - all of it needs testing well before the show. Technology always fails at the worst possible moment unless you've thoroughly tested it.

Train your booth staff. Everyone needs to understand your goals, target audience, qualifying questions, demonstration procedures, and lead capture process. A well-trained team vastly outperforms a talented but unprepared team.

For light-enhanced display units for events, this is when you test all lighting elements and ensure you've ordered appropriate electrical services.

1 Month Before: Final Preparations

Confirm everything. Verify booth space details, hotel reservations, staffing schedules, shipping arrangements, and service orders. A quick confirmation email catches errors whilst there's still time to fix them.

Finalise your pre-show marketing push. Send reminder emails, post frequently on social media, and potentially run targeted ads if budget allows. The goal is maximising booth traffic by ensuring people know you'll be there.

Pack strategically. Create a detailed packing list for everything that needs shipping versus what booth staff will carry. Include backup supplies - extra brochures, business cards, power cables, duct tape, scissors, and cleaning supplies. These extras save you from venue-priced emergency purchases.

Prepare your lead follow-up process. You'll (hopefully) collect loads of leads at the show. Having a defined follow-up process ready before the show means you can act quickly whilst leads are still warm.

2 Weeks Before: Last-Minute Tasks

Confirm arrival times and move-in schedule. Know exactly when you can access your booth space and how much time you have for setup. Coordinate with any contractors who'll be helping with installation.

Brief your booth team one final time. Review goals, messaging, qualifying criteria, demonstration procedures, and schedule. Make sure everyone knows where they're supposed to be and when.

Verify shipping. Confirm that your materials have left for the venue or advance warehouse. Track shipments obsessively because things do occasionally go missing.

Double-check service orders. Ensure all your electrical, internet, furniture, and other service orders are confirmed and correct. Errors discovered on-site cost significantly more to fix.

Show Week: Execution

Move-in day: Arrive early with adequate setup time. Things always take longer than expected. Coordinate with labour if required, supervise booth setup, test all technology, verify that graphics are correctly installed, and arrange materials logically.

Check your services immediately. Make sure electrical outlets work, internet functions, furniture is as ordered, and everything you paid for is actually present. Report issues immediately whilst there's still time to fix them.

Show days: Arrive before doors open each day. Brief staff on daily goals, ensure everyone knows their shifts, monitor lead capture to ensure consistency, stay hydrated and take scheduled breaks (exhausted staff make poor impression), and debrief each evening to discuss what worked and what didn't.

Scan the competition. Walk the floor during slow periods to see what others are doing well or poorly. This intelligence informs future shows.

Move-out day: Pack systematically to avoid leaving anything behind. Label boxes clearly for return shipping. Verify with show management that you're cleared to leave - some shows require final inspections before releasing exhibitors.

Post-Show: Follow-Up and Analysis

First 24 hours: Send a thank-you email to booth visitors whilst the show is still fresh in their minds. This doesn't need to be personalised yet - just a quick "thanks for stopping by, we'll follow up soon" maintains momentum.

First week: Begin qualified lead follow-up. Segment leads by qualification level and tailor your approach accordingly. Hot leads get immediate personal outreach. Warm leads get added to nurture campaigns. Cold leads go into longer-term marketing.

First month: Analyse results against goals. How many leads did you generate? What was the cost per lead? How many turned into opportunities? What worked brilliantly? What failed? This analysis improves your next show.

Debrief with your team. Gather feedback whilst memories are fresh. What booth elements worked? What frustrated visitors? What would staff change for next time? This qualitative insight complements your quantitative metrics.

Update your assets. If graphics or materials performed well, note that for future shows. If something flopped, document why so you don't repeat the mistake.

Scaling the Timeline

Not every show requires six months of planning. Smaller shows or exhibitors with established processes can compress timelines. But rushing causes problems - missed discounts, limited booth space options, stressed staff, and forgotten details.

A general rule: allocate more time for your first show or shows with complex custom booth designs. Subsequent shows using the same display can follow tighter timelines because booth production is already handled.

Common Timeline Mistakes

Don't wait until the last minute to book accommodation. Hotels fill up and prices spike as shows approach.

Don't miss early bird service deadlines. The savings are substantial and deadlines exist for legitimate operational reasons.

Don't leave staffing until the last minute. People have lives and schedules. Asking someone to clear their calendar with two weeks' notice creates resentment and reduces your staffing options.

Don't skip post-show analysis. The lessons you learn inform future shows, and analysing results whilst they're fresh produces better insights.

The Bottom Line

Successful trade show exhibits result from methodical planning that starts months before the show and extends weeks after it ends. Following a structured timeline helps you hit money-saving deadlines, avoid stressful last-minute scrambles, and execute professionally.

The specific timeline adapts to your show size and complexity, but the principles remain constant: plan strategically, book early, prepare thoroughly, execute professionally, and analyse results. Most exhibitors who struggle do so because they compress timelines and rush, not because they lack talent or resources.

Start early, follow your timeline, and trust the process. Your stress levels and results will both dramatically improve.

posted in Trade Show Guide

Published: | Updated:
Peter Symonds

Written By:
Peter Symonds

Peter Symonds is Managing Director at Display Wizard, a Preston based display and exhibition stand provider.

He has over 15 years of experience in the large format print and exhibition industry and has helped grow Display Wizard into one of the UK's leading provider of high-quality display solutions.